Exxon Company, U.S.A., Baton Rouge, Louisiana
Offsite Pipeband Improvements
Phase I - Pilot study to determine the structural integrity of selected pipebands. Preparation of contract drawings; 1979
Phases II, III, IV, V, VI, VII - Preparation of plans, specifications, and construction estimates for modification of 30,000 lineal feet of pipeband, the construction performed on an annual phased basis; 1980 – 1988
CO Furnace Renovations
Investigation of vibration and fatigue of furnace roof structure, design of roof strengthening, preparation of drawings.
Study of temperature effect on structural framing in convection area; 1980
P.P.G. Industries, Lake Charles, Louisiana
K306 Chlorine Cell Bldg Roof Trusses
Condition survey, metal thickness readings, structural evaluation of deteriorated loaded conditions of roof trusses over cell building, repair recommendations; 1999 Engineering Study
Plant C Chlorine Structures
Conditions surveys, structural analysis, priority repair recommendations of equipment support structures, pipe supports and tank support structures in chlorine plant; 2004 Engineering Study.
Mini System Pump Stations
Structural corrosion investigation on 73 mini pump station dry well structures to evaluate the effect of corrosion deterioration and recommend methods of repairs and/or cathodic protection; 1985 Engineering Study
Kaiser Aluminum & Chemical Corporation, Baton Rouge, Louisiana
(Plant Shutdown by Kaiser)
Bauxite Unloading Gantries
Structural evaluation of dynamic loading, fatigue cracking, and corrosion of traveling Space frame structure. Preparation of contract drawings for repairs; 1981
Facilities Audit
Condition survey of structural and civil works; preparation of ratings rough cost estimates of future repairs; 1980 Engineering Study
Alumina Storage and Loadout Conveyors
Engineering investigation of long-term corrosion of Cor-ten steel in chemical atmosphere; 1980 Engineering Study
Tray Thickener Tank Collapse
Design of emergency repairs involving shoring and jacking collapsed tank; strengthening of eight other tanks; 1980
Precipitator Platforms
Investigation of corrosion and fatigue on platforms of 138 precipitators; 1976 Engineering Study.
Atalco, Gramercy Louisiana
(Atlantic Alumina Co., formerly Kaiser Aluminum and Chemical Corp)
Bauxite Unloading Gantries
Structural condition survey & evaluation of dynamic Loading, fatigue failures, and strengthening measures to assure indefinite life of gantry structures; major modifications for space frame jib crane; 1995, 2010
Coke Loader Gantry
Structural analysis of tower legs involving plate theory; preparation of recommended repairs following a number of failures on structure; 1974.
American Cyanamid Company, Milton, Florida
Solvent Recovery Areas 1, 2 and 3: Chemical Areas 1 and 2
Structural steel corrosion survey, structural evaluation, and rehabilitation drawings; 1979-1980
Ormet Corporation, Burnside, Louisiana
Alumina Conveyor System
Modifications for wind strengthening of Foundations, 1979
Press Building
Recommended strengthening of wind bracing of existing structure; 1978 Engineering Study.
Ethyl Corporation, Baton Rouge, Louisiana
Ethyl Chloride & Vinyl Chloride Units
Structural steel corrosion survey, structural evaluation and rehabilitation drawings; 1976
Mississippi Phosphates Corporation
Mississippi Chemical Corporation,
Pascagoula, Mississippi
NPK Fertilizer Plant No. 2
Structural steel corrosion survey, structural evaluation and rehabilitation drawings; 1978
Deterioration Surveys of 12 Separate Units
Program of periodic condition surveys for rehabilitation and maintenance planning, 1976-1982
Engineering Study.