Exxon Company, U.S.A.,
Baton Rouge, Louisiana
Offsite
Pipeband Improvements
Phase
I ‑ Pilot study to determine the structural integrity
of selected pipebands.
Preparation of contract drawings,
1979.............................................................................................................................. $500,000
Phases
II, III, IV, V, VI, VII ‑ Preparation of plans,
specifications, and
construction estimates for modification
of 30,000 lineal feet of pipeband, the construction being $8,000,000
performed on an annual phased basis, 1980 – 1988...................................................... (Capital)
CO
Furnace Renovations
Investigation
of vibration and fatigue of furnace roof
structure, design of roof strengthening, preparation of
drawings....................................................................................................................... $350,000
Study
of temperature effect on structural framing in
convection area, 1980................................................................................................... $200,000
Coke Terminal Bridge
Structural
Steel corrosion survey of
riveted structure,
structural evaluation and rehabilitation drawings, 1993............................................... $800,000
P.P.G. Industries, Lake Charles,
Louisiana
K306 Chlorine Cell Bldg Roof
Trusses
Condition survey,
metal thickness readings, structural
evaluation
of deteriorated loaded conditions of roof trusses
over cell
building, repair recommendations,1999 ......................................... Engineering
Study
Plant
C Chlorine Structures
Conditions surveys, structural analysis,
priority
repair recommendations of equipment support structures,
pipe supports and tank support structures
in chlorine plant, 2004................................................................................... Engineering
Study
Jefferson Parish, Metairie, Louisiana
Mini
System Pump Stations
Structural
corrosion investigation on 73 mini pump
station dry well structures to evaluate the effect of
corrosion deterioration and recommend methods of
repairs and/or cathodic protection, 1985....................................................... Engineering
Study
Kaiser Aluminum & Chemical Corporation,
Baton Rouge, Louisiana
Bauxite
Unloading Gantries
Structural
evaluation of dynamic loading,
Fatigue
cracking, and corrosion of traveling
Space frame structure.
Preparation of contract
drawings for repairs, 1981............................................................................................ $400,000
Facilities
Audit
Condition
survey of structural and civil works; preparation
of ratings rough
cost estimates of future repairs, 1980.................................. Engineering
Study
Alumina
Storage and Loadout Conveyors
Engineering
investigation of long term corrosion of
Cor‑ten
steel in chemical atmosphere, 1980.................................................. Engineering
Study
Tray
Thickener Tank Collapse
Design
of emergency repairs involving shoring and
jacking collapsed tank; strengthening of eight other
tanks, 1980.................................................................................................................... $250,000
Precipitator
Platforms
Investigation
of corrosion and fatigue on platforms of
138 precipitators, 1976.................................................................................. Engineering
Study
Kaiser Aluminum & Chemical Corporation,
Gramercy, Louisiana
Bauxite Loading Gantries
Structural
condition survey & evaluation of dynamic
Loading,
fatigue failures, and strengthening measures
To
assure indefinite life of gantry structures; major
Modifications
for space frame jib crane, 1995, 2010………………………...Project in progress
Coke Loader Gantry
Structural
analysis of tower legs involving plate theory;
preparation of recommended repairs following a number
of failures on structure, 1974........................................................................................ $150,000
American Cyanamid Company, Milton, Florida
Solvent
Recovery Areas 1, 2 and 3:
Chemical
Areas 1 and 2
Structural
steel corrosion survey, structural evaluation,
and rehabilitation drawings, 1979‑1980....................................................................... $300,000
Ormet Corporation, Burnside,
Louisiana
Alumina
Conveyor System
Modifications
for wind strengthening of Foundations,
1979.............................................................................................................................. $100,000
Press Building
Recommended
strengthening of wind bracing of existing
structure, 1978............................................................................................... Engineering
Study
Ethyl Corporation, Baton Rouge,
Louisiana
Ethyl
Chloride & Vinyl Chloride Units
Structural steel corrosion survey, structural
evaluation
and
rehabilitation drawings, 1976............................................................................. $1,500,000
Mississippi Phosphates Corporation
Mississippi
Chemical Corporation,
Pascagoula, Mississippi
NPK Fertilizer Plant No. 2
Structural
steel corrosion survey, structural evaluation
and rehabilitation drawings, 1978................................................................................ $500,000
Deterioration
Surveys of 12 Separate Units
Program
of periodic condition surveys for rehabilitation
and
maintenance planning, 1976‑1982.......................................................... Engineering
Study
|